28 July 2023 - Beta release of Burnett Mary region instance
Initial release of Burnett Mary region instance of Natural Capital Plan for testing and review
30 June 2023 - Updated yield based calculation, updated initial condition microbial data
Yield based calculation
Updated computation to ensure that if Action yield (e.g. t/ha reduction) is greater than the initial condition Yield, that the maximum possible reduction is limited to the initial condition yield.
Microbial data
The initial condition microbial data (derived using Baker et al (2016)) updated to reflect a less conservative estimate of potential microbial pollution (Herds located near waterways without buffer zones). This is to reflect observed survey results conducted in South East Queensland.
30 May 2023 - beta released for testing
Initial release of Natural Capital Plan (Queensland Murray Darling Basin Region)
Late 2023 - Planned - beta released for testing
Planned release date for internal testing (Queensland Murray Darling Basin region)
11 October 2023: Added provision for self managed Verification
Functionality to allow for Verification of Reef Credits to occur outside the Application has been added. Under the ‘Select Verifier’ dropdown, users can select “Manage Verification outside the Application”. Then select the ‘Generate report’ button to create the monitoring report summary.
25 July 2023 - Added Reviewer functionality for Verifiers
Verifiers can now nominate reviewers from within their group. Reviewers are given access per monitoring report. Reviewers have read only access to the monitoring report to support the Verifier in revieing a monitoring report. Only the nominated project Verifier has write access to approve/verify the monitoring report.
01 March 2023 - Initial V1 release
Release of V1.0. Includes Sugarcane, Banana, Grazing and Cropping industries.
Version handling will allow upload of projects (collections) created in P2R Projector from September 2021.